Case Studies

Flood Control / Rainwater

Underpass Drainage System

Underpass Drainage System
Japan

Underpass Drainage System
Tsurumi's pumps were chosen to drain water from an underpass that runs east-west underneath the railway tracks at Nagareyama Otakanomori Station where the Tsukuba Express and Tobu Line intersect in Nagareyama City, Chiba Prefecture. Highly efficient models with large diameter bore for discharging solids were delivered for the job. Since the pumps and flood warning signs went into service in October 2017, no vehicles have been trapped by flood waters.
* Underpass: A roadway that passes underneath a railway or other thoroughfare.

Specifications of Installed Equipment

Installed Equipment Specifications
Pumps with Channel Impeller Model : TO200B622
Discharge Bore : 200mm
Motor Output : 22kW
Total Head : 13m
Capacity : 5.1m3/min
  • Contact Us
  • Catalog
    Download